
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/">
  <dc:source>Mining and Metallurgy Engineering Bor(1-2)</dc:source>
  <dc:language>eng</dc:language>
  <dc:description xml:lang="eng">Abstract:
Geotechnical investigations were conducted at the construction site of the new crushing plant at the open pit &quot;Kriveljski kamen&quot; in Bor. The construction of parts of this plant is planned on an unstable slope. The aim was to define the lithological-geotechnical material and terrain structure as a basis for determining the optimal conditions of construction, excavation methods, funding and undertaking the reclamation measures in the area intended for accommodation of facilities.</dc:description>
  <dc:description xml:lang="eng">Received: 07.06.2021.

Revised: 10.06.2021.

Accepted: 14.06.2021.</dc:description>
  <dc:format>application/pdf</dc:format>
  <dc:format>443941 bytes</dc:format>
  <dc:type>info:eu-repo/semantics/article</dc:type>
  <dc:title xml:lang="eng">Geotechnical investigations for defining the building conditions of the new quarry crusher plant in Bor</dc:title>
  <dc:subject xml:lang="eng">Keywords: geotechnical investigations, crushing plant, unstable slope, construction conditions</dc:subject>
  <dc:date>2021</dc:date>
  <dc:creator>Tašić, Dušan</dc:creator>
  <dc:creator>Ignjatović, Dragan</dc:creator>
  <dc:creator>Đurđevac Ignjatović, Lidija</dc:creator>
  <dc:creator>Đurđevac, Vanja</dc:creator>
  <dc:rights>All rights reserved</dc:rights>
  <dc:identifier>https://unilib.phaidrabg.rs/o:522</dc:identifier>
  <dc:identifier>doi:10.5937/mmeb2101013T</dc:identifier>
  <dc:identifier>cobiss:68183561</dc:identifier>
</oai_dc:dc>
